MGT613 - Production / Operations Management Assignment # 2 Solution

MGT613 - Production / Operations Management

Assignment # 2


b. Find out sample proportion defective (p) i.e. no. of defectives per week / Sample size

Sample number

No. Of Defectives

(b)Sample Proportion defective (p)

1

16

0.005333333

2

13

0.004333333

3

20

0.006666667

4

3

0.001

5

18

0.006

6

6

0.002

7

26

0.008666667

8

9

0.003

9

8

0.002666667

10

24

0.008

11

14

0.004666667

12

5

0.001666667

13

12

0.004

14

19

0.006333333

15

18

0.006

211

0.070333333

a. Find out average population proportion defective which would be the central line on

P-chart (p) i.e. total defectives/ sample size*weeks

p = 211 / (300 * 15)

= 211 / 45000

p = 0.004688889

p = 0.00469 (Approximate)

c. Calculate standard deviation of distribution of proportion defective (σp) using the formula

σp = √ p (1– p)/n. Where n= sample size.

= √ 0.00469 (1 – 0.00469) / 3000

= √ .000001556

= .001247397

σp = .00125

d. Find out upper control limit (UCL) and lower control limit (LCL) using the formula

(UCL p = p + zσ p and LCL p = = p - zσ p )

Use three sigma control limits (z=3)

1) UCL p = p + zσ p

= .00469 + 3 (0.00125)

UCL p = .00844

2) LCL p = p - zσ p

= . 00469 - 3 (0.00125)

LCL p = .00094

e. On the basis of above data construct a p-chart taking sample numbers on x-axis and sample proportion defective (p) on y-axis.




f. Which sample number is showing the highest proportion of defective? Is the process still in control? Analyze the trend in chart.

In the above diagram the sample no.7 is the highest value and this value is out of the upper and the lower limit

UCL p = .00844 and LCL p = .00094

High proportion of the defect is Value = .0087

That’s why we can say that the process is not through the statistical process.



Note...plzz dont copy past material: